Scope Creep and the Boiling Frog (Episode 66)

January 24, 2019 In Design Opinion, PowerPoint Design Trend By @pptwiz

Scope Creep and the Boiling Frog (Episode 66)

All Presentation projects all have parameters; what is needed, when it is needed, who needs to approve, how you will be paid. Project scope can be very simple or very robust. One thing that is almost inevitable, the project scope changes before the final design piece is approved. Join Troy, Sandy, and Nolan as they talk about how they setup project scope, and stories of Project Scope that slowly expanded throughout the project timeline.



Blog

  • Inside the creative process: designing a partnership pitch deck (Episode #245) May 7, 2026
  • When bullet points go so bad they are not needed (Episode #244) May 7, 2026
  • 100+ hours for an eight-minute presentation with John Chen (Episode #243) May 7, 2026

Social Media

Couldn't connect with Twitter

Contact

Minneapolis
contact@presentationwiz.biz
612.220.7156

© 2017 Presentation Wiz Inc. | Power Point is a registered trademark of Microsoft Corporation ©